Week 45Early November · ~5 min read · Ontario construction

Cold Weather Preparedness

↓ Download printable PDF

The first hard freeze comes fast in Ontario. It catches crews before anyone's back in the habit of watching their footing — and it catches the site too: a cracked water line, a hose frozen solid, a machine that ran fine yesterday. An hour of prep now keeps people on their feet; the saved machines are the bonus.

The hazard

Frozen ground and overnight ice hide slip and trip hazards — pooled water, wet plywood, churned mud all turn slick by morning, and the slips start before the first real snow. The cold is hard on the site itself too: water expands when it freezes and splits pipes, pumps and fittings, fuel can gel, and batteries lose capacity. A site that isn't ready loses mornings to burst lines and machines that won't start.

What to do — people first

Then the site and the gear

Watch out for

Talk it over

Fall 2026 · GTA & Hamilton

See your crew's comprehension, not their signatures.

A signed talk proves attendance. Dashpot runs a five-minute SMS dialogue with each worker and produces a per-worker record of what they actually understood — from the JSP your site already fills out.

Request a pilot conversation